Projects

I. ITTIA × L&R Ingeniería Partnership (2025–)

ITTIA and L&R Ingeniería have been building a working partnership since 2025. ITTIA is an established US-based software company (ITTIA blog) and an STMicroelectronics Authorized Partner: their ITTIA-DB package is a production-grade database platform to deploy deterministic, power-fail-safe data management on STM32 microcontrollers. L&R Ingeniería brings embedded hardware design and firmware expertise with field experience in systems throughout Patagonia. Together we offer production-grade edge data intelligence on STM32. Upcoming workshops will demonstrate these capabilities based on an L&R Ing. METEO module connected to STM32H573I-DK, FreeRTOS and ITTIA-DB-Lite v9.3 + Analitica.

Full details — ITTIA × L&R Ingeniería


II. INTI Test Site for Small Wind Turbines — Cutral-Co (2012–2025)

Project report published 2025: “Test Site for Small Wind Turbines – Technical and Logistical Issues of a Decade-Long Project”

Historical sequence: First 2 PWRC2 stations / 1 METEO module and associated instrumentation for power-curve testing (June 2012). Two more PWRC2 units installed and periodic software and firmware updates performed (2014–2024). Conversion to measurement of grid-connected SWTs since 2018.

II.a) Added Bootloader for swifter firmware updates of PWRC2 units (2021) — Download PDF (Sp — 800 kB)

II.b) One of the PWRC2 Units for 48V/50A SWT testing, with Modbus/LAN monitoring:

PWRC2 unit for 48V/50A SWT with Modbus/LAN

II.c) View of INTI’s Test Site Opening Day / June 26, 2012 — 4 SWTs installed:

INTI Test Site opening day June 2012

II.d) Meteo and Secondwind Nomad 2 reference station:

INTI Meteo and Secondwind Nomad 2 reference station

II.e) First data sequences stored in SD cards, from SWT & Meteo units:

First data sequences from SWT and Meteo units

III. 2010–2011 Control and Instrumentation for Wind/PV Dosification Pump Systems (Petrobras 2)

Control and instrumentation for 5 Wind/PV systems driving dosification pumps — developed for DM Energías Renovables — 4 systems installed in Boleadoras/Laguna del Oro, S. Cruz. SCADA monitoring and internal data logging on SD cards.

III.a) Laguna del Oro 14 (October 2010):

Laguna del Oro 14 system installed
LdelO14 system internals

LdelO14 System installed 10/2010 and recent views.

LO14 main display CL2bm1
LO14 dosification pump

Main LdelO14 Display using CL2bm1 board, and dosification pump view.

III.b) Campo Indio 32 (November 2010 – February 2011):

CI32 solar and shelter
CI32 complete control panel

CI32 panel detail
CI32 inverter radio FVR

Views of CI32 system (11/2010 – 02/2011), and CL2bm1 main display beside solar/PV controller + inverter.

III.c) Campo Indio 21 (February 2011):

CI21 windmill shelter and PV
CI21 installed subsystems

Installed CI21 subsystems (02/2011), PLC-Modbus controller and CL2bm1 main display.

CI21 complete view

III.d) Campo Indio 36 (February 2011):

CI36 solar and shelter
CI36 complete panel

View of CI36 system (02/2011), controllers and CL2bm1 main display.

CI36 panel detail

IV. 2007–2008 Control and Instrumentation for Wind/Diesel Pump Systems (Petrobras 1)

Control and instrumentation for 5 Wind/Diesel systems driving dosification pumps — for DM Energías Renovables — Sites at Puesto Peter 37 and 38. SCADA monitoring and internal data logging on EEPROM (DLCy boards).

PP37 winter 2008
PP38 wind turbine view

Systems installed 06/2008 at P Peter 38, and maintenance visit at PP37.

PP37 operational data 04/2009

Periodic data retrieval on PP37/P38 systems, including battery voltage, wind power current, diesel status.

PP38 interior view 2009
Automatic braking operation 2008

Automatic braking / data acquisition / SCADA with Modbus, and diesel chargers at PP37/38.


V. 2004–2010 ANR-SC02/2003 FONTAR — Low-Cost Open Architecture Data Logger

“Low-cost, open architecture data logging system for energy and environment monitoring applications.” Development of 2 data acquisition boards, final report approved March 2010.

ANR/SC02 project evolution 2004 to 2009

ANR/SC02 Project evolution — 2004 to 2009

CL2bm1/AVR board hardware development finished 03/2010

CL2bm1/AVR board — Hardware development finished 03/2010


VI. 2004–2007 Energy Monitoring and SWT Power Curve Systems — PERMER (Chubut)

Energy monitoring and Small Wind Turbine power curve verification systems — Pilot PERMER programme (Chubut) at Quichaura and Costa de Ñorquinco, with WorldBank/GEF funding. For Aerowind S.A. at Puerto Madryn.

EM/12 calibration at Puerto Madryn
EM/12 unit delivery

Calibration and delivery of EM/12 units in Puerto Madryn / Aerowind (2007).

EM/12s ready for shipment
PWRC/12 testing at Costa de Ñorquinco

EM/12s ready for shipment and testing of PWRC/12 at Costa de Ñorquinco with CREE personnel (2007).

PWRC+DL2/12 equipment installation at Pocitos de Quichaura

PWRC+DL2/12 equipment installation at Pocitos de Quichaura / Pbro. García (12/06)

Quichaura measurement tower wind sensor installation

Quichaura — Measurement tower wind (NRG) sensors installation

Firmware update at Quichaura
Quichaura firmware update with CREE/Aerowind personnel and Cañiolef family

Quichaura — firmware update with CREE/Aerowind personnel and Cañiolef family.

Documents from PERMER Project / L&R Ing.:


VII. 2005–2009 Electronic Brake System for EOLUX 1kW Wind Turbines (Freno/1)

Electronic Brake and event registration system for EOLUX 1kW wind turbines co-developed with Dante Melano Comunicaciones (Freno/1). Initial testing 08/2006 at Ea. Los Pozos, Santa Cruz.

Freno/1 prototype 2006
Freno/1 panel wall mounted

Freno/1 verification August 2006
Wind turbine exterior Los Pozos 2006

Verifying prototype and operating wind-turbine in high winds at Los Pozos (2006).

Preliminary Freno/1 brochure — Spanish (2007) PDF (93K)


VIII. 2003–2006 Wind Energy Consultancy for ENAP/Chile

Wind energy consultancy for ENAP/Chile (Chile’s National Oil Company). Isolated grid wind-turbine connection studies for Cerro Sombrero / Cullen (2003–4) and PCP pumps applied to wind power (2005–6).

Initial ENAP meetings 2003
Cullen and Cerro Sombrero visits

Initial meetings 2003 + Cullen / Cerro Sombrero visits.

PCP pump head assembly

PCP pump — head assembly

Gas lift well
VFD connected to PCP in Tierra del Fuego, Pozo Fresia

VFD connected to PCP in Tierra del Fuego, Pozo Fresia, with Dr. Peña / Dr. Cardenas of UMAG (06/2005)

Preliminary report — Distributed control for Wind Power in Cerro Sombrero (2004 — Spanish) PDF (1.1 MB)


IX. 1997–2002 DC/DC Converters for Cathodic Protection — Pérez Companc / INGEZA / SETRA

Power DC/DC converters for cathodic protection and energy supply with Bergey BWC 1500 turbines for Pérez Companc / INGEZA and SETRA SRL.

L&R Ing. converters 0.5kW in operation at Sur Rio Chico

L&R Ing. converters 0.5 kW in operation — Sur Rio Chico / PECom — 1998

BWC generator replacement by SETRA/L&R Ing. 2001

BWC generator replacement by SETRA / L&R Ing. in 2001

DC/DC converter development 1997
BWC1500/ChAk installation 2001

DC/DC Converter development (1997) and BWC1500/ChAk installation (2001).

Report with SETRA — BWC1500 re-installation 2001 (Spanish — 407K PDF)

Please contact us for further information about L&R projects.